The first NOKERA houses
The plot of land in Singen, located between Rielasinger Straße and Obere Beugen, covering an area of 2,393m², has been newly developed with two buildings, each containing two houses. In October 2023, the first NOKERA houses were completed. The four buildings comprise a total of 39 residential units, with various layouts ranging from 2-bedroom flats with 41m² of living space to 5-bedroom flats with 106m². Each building features a staircase with an integrated lift, ensuring barrier-free access to every floor.


Magnificent courtyard
The apartment buildings are accessed at ground level and barrier-free via the shared courtyard, which includes a playground situated above the underground car park.

Climate-neutral houses
The buildings meet the KfW 40 Efficiency House standard and, thanks to photovoltaic systems and heat pumps, consume 90% less energy than the German average.*
The project in numbers
39
Residential units
2ʼ725m²
Living space
Oktober 2023
Completion
71%
Less CO₂ emissions than the German average*
1.46t CO₂
Savings per person / year*

Sustainable timber construction
The above-ground floors, with the exception of the stairwells and parts of the ceiling structure, are built using sustainable timber construction.

Facade Design
The timber construction is carried through consistently into the visible materials of the facade. The exposed timber facade is divided horizontally and vertically by cornices and pilasters, while the ground floor is distinguished by a rendered facade.